Greensferry I-90 Overpass Construction Pictures
Initial Overhead View With I-90 Running Left to Right Current Artistic Rendering of Finished Overpass With Seltice to the Left and Polston to the Right
First Excavation 12-09-14 for column base on south side of I-90.
First Pour 12-15-14